A site visit to Al Rehman Garden Phase 7 can now separate completed work from active earthworks. The comprehensive on-site survey shows steady development across residential and commercial sectors, from foundational earthworks and utility installation to completed road surfacing and home construction.
Entrance and Early Sectors
The entrance has a wide, paved main boulevard with decorative street poles, landscaped median beds, ornamental urns, and palm trees. A dedicated security checkpoint monitors traffic flow. Key intersections display large architectural monuments and finished roundabouts with stone masonry and green belts maintained by regular watering and landscaping. Near the entry zone, the central administrative head office, with a white circular facade and arched architecture, sits alongside commercial storefronts and developer offices.
Early phases—Block A, Block B, Haider Block, and adjacent sectors—show advanced habitation and structural readiness: underground electrical wiring throughout developed sectors to preserve street aesthetics; multiple multi-story residences actively being built with brickwork, concrete slab casting, and reinforced damp-proofing at foundation level; several inhabited modern houses served by paved asphalt roads, curbs, and street lighting; central green parks, demarcated open spaces, and an operational white grand mosque in Block B; active dedicated commercial zones along avenues with several retail structures and multi-story business premises under development.
Block A Extension and Blocks C, D
Block A Extension has clear demarcations separating residential sectors and commercial avenues. Designated land is reserved for educational facilities, including a planned site for The Lahore City School. Plot sizes include commercial frontages of two to four marlas along secondary access roads and wide boulevards.
Development is concentrated heavily in Block D, spanning D1, D2, D3, and D4. Heavy earthmoving machinery, including motor graders and vibratory soil compactors, prepares sub-base surfaces—the compacted layer below asphalt—along main and connecting streets. Street and block directional signs, such as Block D1 Street 01 and Street 10, are erected at intersections to mark plot boundaries and street alignments. Crushed stone and aggregate layers are actively hauled and spread by tractor-trailers, followed by grading and water compaction to prepare asphalt surfacing. Subterranean drainage lines are installed, and concrete manhole covers are systematically brought to ground level before final road surfacing.
Block C, encompassing C1, C2, and C3, is another key development frontier. Heavy excavators level trenches and install drainage along perimeter and street corridors. Material trucks unload crushed stone aggregate along primary pathways, where graders and rollers level corridors into uniform roadbeds. Graded paths connect internal sector routes to government-access roads and external boundaries. Throughout Blocks C and D, central green medians along wide avenues have been filled with topsoil in preparation for landscaping, curbs, and paved footpaths once asphalt carpet laying commences.
کیا آپ رئیل اسٹیٹ مارکیٹ کے تازہ ترین رجحانات سے باخبر رہنا چاہتے ہیں؟
محفوظ اور منافع بخش سرمایہ کاری کے فیصلوں کے لیے ہمارا آفیشل واٹس ایپ چینل آج ہی فالو کریں! ہم آپ تک پہنچاتے ہیں مارکیٹ کی درست ترین معلومات اور بروقت تجزیات۔ 📈✨
👇 ابھی ہمارے چینل کا حصہ بنیں:
https://whatsapp.com/channel/0029Va8D7O511ulLB3FgCK0u
Choudry Mujahid Yasin (CMY ) Owner of LahoreRealEstate.Com
https://wa.me/923224929992 Direct message to me now